{"id":235662,"date":"2024-03-19T22:11:31","date_gmt":"2024-03-19T19:11:31","guid":{"rendered":"https:\/\/bioforce.ee\/uncategorized\/bioforce-to-build-a-new-biomethane-plant-in-valga-county\/"},"modified":"2024-11-07T20:46:18","modified_gmt":"2024-11-07T17:46:18","slug":"bioforce-to-build-a-new-biomethane-plant-in-valga-county","status":"publish","type":"post","link":"https:\/\/bioforce.ee\/en\/news\/bioforce-to-build-a-new-biomethane-plant-in-valga-county\/","title":{"rendered":"Bioforce to Build a New Biomethane Plant in Valga County"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;0px|||||&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.24.3&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; hover_enabled=&#8221;0&#8243; global_colors_info=&#8221;{}&#8221; sticky_enabled=&#8221;0&#8243;]<\/p>\n<p>Bioforce Laatre O\u00dc, a subsidiary of Bioforce Group, is constructing a new biomethane production facility in the village of Laatre, Valga County, with an annual production capacity of 23,000 MWh. SEB is funding the project with a \u20ac6 million green loan. <\/p>\n<p>The total project cost is \u20ac9.4 million, and the plant is scheduled for completion in the fourth quarter of 2024. The facility will primarily use manure from Laatre Piim AS and Kesa-Agro O\u00dc to fully meet the plant\u2019s projected output capacity. Biomethane produced will be transported to Tallinn\u2019s CNG stations to supply the city\u2019s CNG buses.   <\/p>\n<p>&#8220;Bioforce Laatre will be our third biomethane production plant. We are pleased with the outstanding collaboration with all partners, which has significantly contributed to the project\u2019s swift development and construction,&#8221; said Bioforce representative Siim Tenno. &#8220;We would especially like to thank SEB for their belief in our mission and their support in financing this project,&#8221; he added.<\/p>\n<p>Read more <a href=\"https:\/\/www.seb.ee\/foorum\/pressiuudised\/seb-finantseerib-rohelaenuga-bioforce-laatre-ou-poolt-arendatavat-biometaani\"><u>https:\/\/www.seb.ee\/foorum\/pressiuudised\/seb-finantseerib-rohelaenuga-bioforce-laatre-ou-poolt-arendatavat-biometaani<\/u><\/a> <\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bioforce Laatre O\u00dc, a subsidiary of Bioforce Group, is constructing a new biomethane production facility in the village of Laatre, Valga County, with an annual production capacity of 23,000 MWh. SEB is funding the project with a \u20ac6 million green loan. The total project cost is \u20ac9.4 million, and the plant is scheduled for completion [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":235492,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[22],"tags":[],"class_list":["post-235662","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/posts\/235662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/comments?post=235662"}],"version-history":[{"count":4,"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/posts\/235662\/revisions"}],"predecessor-version":[{"id":235667,"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/posts\/235662\/revisions\/235667"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/media\/235492"}],"wp:attachment":[{"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/media?parent=235662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/categories?post=235662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bioforce.ee\/en\/wp-json\/wp\/v2\/tags?post=235662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}